Читайте также: |
|
· As per Company external qualification and training matrix.
· Basic English
EXPERIENCE
· At least five (5) years experience as a rigger together with a minimum of one (2) year experience in offshore installation or similar offshore role.
1.1.1.2.11 Welder – JLT/FL
RESPONSIBLE TO | Welding Foreman |
OBJECTIVE | To perform welding activities in accordance with his qualification and company specification. |
RESPONSIBILITIES
· To become familiar with and maintain awareness of the relevant Company requirements and where applicable, the latest industry codes and standards including statutory rules and regulations.
· To perform duties of welding and piping for the construction or repair of parts of the plant and particulars of machines and equipment, using an electric welder, oxyacetylene equipment and portable electric grinder.
· To maintain the equipment entrusted to him.
· To report any irregularities he notices while carrying out these duties to his superior.
· To carry out his work in a manner consistent with the Company’s safety directives.
· To perform welding and cutting operations on deck during platform installation and on adjacent cargo barges.
AUTHORITY
· To perform welding operations within the frame of his responsibilities and as directed by the welding foreman.
· Stop welding activities if required on safety grounds if to continue could cause any damage or injury.
QUALIFICATIONS
· As per Company external qualification and training matrix.
· Basic English.
EXPERIENCE
· Welding qualification test successfully achieved.
1.1.1.2.12 Wrapper / Scaffolder
RESPONSIBLE TO | Deck Foreman |
OBJECTIVE | Safe execution of wrapping/scaffolding activities as directed by the Deck Foreman |
RESPONSIBILITIES
· Ensure that wrapping/scaffolding operations are performed in a safe manner and in accordance with the instructions given.
· Ensure that only suitable equipment is used during wrapping/scaffolding operations.
· Monitor the condition of wrapping/scaffolding tools/equipment before and during use and report any deficiency.
· Ensure that scaffolding equipment is properly stored and maintained.
· Perform all duties as directed by the Deck Foreman.
· Perform any additional duties within own experience and capability as advised by the Deck Foreman.
· Report unsafe working conditions, near misses and incidents/accidents.
AUTHORITY
· Stop activities if required on safety grounds if to continue could cause any damage or injury.
Дата добавления: 2015-11-14; просмотров: 57 | Нарушение авторских прав
<== предыдущая страница | | | следующая страница ==> |
RESPONSIBILITIES | | | QUALIFICATIONS |