Pauses or delays between activities are indicated in the network diagram.

Читайте также:
  1. A contract between Continental Equipment and TST Systems
  2. A law – it is connection between the phenomena: general, objective, substantial and necessary. There are 3 laws of dialectics, we will study them on the next lecture.
  3. A new study looks at the relationship between media use and mental health, but does not answer a big question.
  4. A. Decimals are indicated by a point
  5. A. Listen to a conversation between a student and a professor, and answer the questions.
  6. According to IAS 16, for accounting of PPE items an entity may choose between
  7. Activities for Pleasure

2.5 Schedule Development

To establish the project schedule, compute two schedules:

l The early schedule is calculated using the forward pass.

The early schedule consists of the earliest times at which an activity can start and finish

l The late schedule is calculated using backward pass.

The late schedule consists of the latest times at which an activity can start and finish without delaying the completion date of the project

2.5 Schedule Development

The combination of both schedules gives two additional information about the project schedule:

l The window of time within which each activity must be started and finished

l The sequence of activities that determine the project completion date

The Critical path, can be defined:

Is the sequence of activities whose early schedule and late schedule are the same,

This is the sequence of activities with zero slack

2.5 Schedule Development

The Earliest Start (ES)

l TheES time for an activity is the earliest time at which all of its predecessor activities have been completed and the activity can begin.

l The ES time for an activity with no predecessor activities is set to 1, the first day of the project

l The ES time of activities with one predecessor activity is determined from the EF time of the predecessor activity

l The ES time of activities having two or more predecessor activities is determined from the latest of the EF times of the predecessors

2.5 Schedule Development

The Earliest Finish (EF)

EF = ES + E – 1 time unit; E is duration

2.5 Schedule Development

Latest Start (LS) and Latest Finish (LF)

The LS and LF times of an activity are the latest times at which the activity can start or finish without causing a delay in the completion of the project

To calculate LS and LF times:

Work backward in the network diagram


Дата добавления: 2015-10-23; просмотров: 98 | Нарушение авторских прав


Читайте в этой же книге: Resource leveling | Defining a Work Breakdown Structure | Is a tabulation of activities to be included on a project schedule. The list should include | Top-Down Estimates | Staffing management plan | Quality assurance |
<== предыдущая страница | следующая страница ==>
Is a network diagramming technique used to predict total project duration.| Task 1 is completed at the end of day 20 instead of day 10, Task 2 is completed at the end of day 25 instead of day 20, and Task 3 is still completed on day 30.