Is a network diagramming technique used to predict total project duration.

Читайте также:
  1. A divisive NHS bill may end up being less alarming than its many foes predict
  2. A telephone projecting from the wall. The inspector sat down at his desk.
  3. A. Whether total revenue (expenditure) increases or decreases as price changes
  4. Animate Objects Technique
  5. Assert authority. Networking.
  6. Auxiliary techniques of investigation
  7. Burton’s reanimated pet project, By Nigel Andrews

Critical path method helps to combat project schedule overruns.

A critical path for a project is the series of activities that determine the earliest time by which the project can be completed.

2.5 Schedule Development

There are normally several tasks done in parallel on projects, and most projects have multiple paths through a network diagram.

Critical path the longest path through the network diagram and has the least amount of slack or float.

Slack or float is the amount of time an activity may be delayed without delaying a succeeding activity or the project finish date.

2.5 Schedule Development

Free slack or free float is the amount of time an activity can be delayed without delaying the early start date of any immediately following activities.

Total slack or total float is the amount of time an activity can be delayed from its early start without delaying the planned project finish date.

2.5 Schedule Development

Project Constraints: A project manager may wish to enforce “artificial constraints” based on circumstances outside of the project itself.

Whenever possible, avoid using specific dates for tasks unless it is absolutely required.

The reason for avoiding date constraints is signifying a certain task must happen on a specific date regardless of the completion of tasks before or after it.

2.5 Schedule Development

There are three types of date constraints:

l No earlier than This constraint specifies that a task may happen any time after a specific date, but not earlier than the given date.

l No later than This constraint is a deadline oriented. The task must be completed by this date.

l On this date This constraint is the most time orientated. The task must be completed on this date, no sooner or later.

2.5 Schedule Development

Schedules Calculation

l The entries in the activity node describe the time-related properties of the activity:

l Expected duration (E)

l Calculated values (ES, EF, LS, LF)

l Slack

l Lag variable


Дата добавления: 2015-10-23; просмотров: 141 | Нарушение авторских прав


Читайте в этой же книге: Resource leveling | Defining a Work Breakdown Structure | Task 1 is completed at the end of day 20 instead of day 10, Task 2 is completed at the end of day 25 instead of day 20, and Task 3 is still completed on day 30. | Top-Down Estimates | Staffing management plan | Quality assurance |
<== предыдущая страница | следующая страница ==>
Is a tabulation of activities to be included on a project schedule. The list should include| Pauses or delays between activities are indicated in the network diagram.