Example: 12. padding - (j) sand placed on the ditch bottom to cushion the pipe.
1. | ROW | A. | join sections of line pipe providing consistency, uniform welds and fewer repairs. |
2. | trenching (ditching) | B. | the primary strength weld that fuses the two pipes |
3. | stringing | C. | method for constructing the pipeline across such obstacles as streams or wetlands. |
4. | skidding | D. | customary inspection by internal X-ray, external gamma ray or ultrasonics. |
5. | welding | E. | bare sections at the pipe welds covering the exposed pipe and the weld. |
6. | root | F. | line pipe lifted on skids along the ROW so that the entire circumference is accessible. |
7. | HDD | G. | ditch spoil pushed back into the ditch to cover the pipe except for certain sections that must be left uncovered to make tie-in welds and allow for hydrostatic testing. |
8. | backfilling | H. | width determined by the diameter of the pipeline to be installed and includes room for the pipeline and working space for the construction equipment used to install the pipeline. |
9. | field-joint coating | I. | laying sections of pipe along the ROW |
10. | tie-in welding | J. | sand placed on the ditch bottom to cushion the pipe. |
11. | NDT | K. | individual pipe string ends that are cut and trimmed to join the pipe strings with external clamps accurately aligning the pipe. |
12. | padding | L. | excavated soil (spoil) deposited on the ditch bank. |
25. Number these instructions for installing a pipeline by HDD (Horizontal Directional Drilling) across a river. Describe this process by putting the statements into logically order. The first element is done for you.
A. | It is filled with water to contain and settle the spoil or cuttings that result from the operation. | |
B. | The pre-reaming operation pulls the reamer back, cutting and enlarging the opening. | |
C. | The trailer-mount is positioned near an excavation on the near side (rig side). | |
D. | After the pre-reaming operation is completed, the drill pipe is pulled back from the near side | |
E. | Then a reaming device is attached to enlarge the pilot hole to accommodate the line pipe | |
F. | A cap with a swivel joint is connected to the leading end of the pipe string. | |
G. | The pull-back operation installs the line pipe under the river. | |
H. | The drill string contains a survey instrument near the head or cutting end, which guides the cutting head in both vertical and horizontal directions. | |
I. | The swivel joint is connected to the reamer. | |
J. | This first drill forms the “pilot” hole. | |
K. | A mixture of drilling mud and water is pumped into the hole, lubricating the drill string. | |
L. | The line pipe string to be installed is welded. | |
M. | The drill moves to the opposite bank under the bottom of the river. | |
1. | N. | Here is a typical river crossing. |
O. | The drilling rig pulls the reamer back through the hole from the pipe side to the rig side, along with the pipe string connected to the reamer. |
26. Which steps in Ex. 22 (pg.388-389) do these diagrams show?
_____________ ______________ _____________
____________ _____________ _____________
_______________ ______________ _____________
Дата добавления: 2015-10-26; просмотров: 112 | Нарушение авторских прав
<== предыдущая страница | | | следующая страница ==> |
Pipeline Construction | | | Refer to the instructions in Ex. 22 (pg. 389-390) again and circle T (True) and F (False). |