Студопедия
Случайная страница | ТОМ-1 | ТОМ-2 | ТОМ-3
АвтомобилиАстрономияБиологияГеографияДом и садДругие языкиДругоеИнформатика
ИсторияКультураЛитератураЛогикаМатематикаМедицинаМеталлургияМеханика
ОбразованиеОхрана трудаПедагогикаПолитикаПравоПсихологияРелигияРиторика
СоциологияСпортСтроительствоТехнологияТуризмФизикаФилософияФинансы
ХимияЧерчениеЭкологияЭкономикаЭлектроника

The information presented at each static event is consistent with the overall objectives as outlined in the Static Events Rules.

Читайте также:
  1. A1.2 Vehicle Design Objectives
  2. D8.25 Post Event Engine Check
  3. Digestion and assimilation of advertised information
  4. General Rules.
  5. INFORMATION
  6. INTRODUCTION (INFORMATION
  7. Remember the information on “false friends” in the table

(a) In the Design event, the business logic case will be used to identify how the team determined the

trade off between design for performance and design for manufacture and cost, how these requirements were considered in the overall concept and whether these were achieved in the final

vehicle.

(b) In the Cost event, the business logic case will be used to determine that the cost target was met for the same design solution and how Cost was integrated into the overall concept and the

iterative design process.


 

 

(c) In the Business Presentation event, the business logic case will be used to assess whether the business presentation is appropriate for the market and business strategy that the team has identified

(d) For some Formula Student/FSAE Events, if the event is over subscribed, then the entry selection process may include assessment of the quality of the Business Logic Case supplied.

 

S3.3 All teams must submit a Business Logic Case report in accordance with the general format applicable for the year of competition “FSAE Business Logic Plan 201X”. The report must be submitted on the template. Refer to the applicable competition website to acquire the template.

 

This report must be submitted by the deadline which will generally be ~ 6-9 months before the competition. Refer to the deadlines posted on the website for each specific competition.

 

ARTICLE 4: COST AND MANUFACTURING EVENT

 

Important Notice: Additional information about the Cost and Manufacturing Event including Cost Tables and other information can be obtained from the www.fsaeonline.com website which is also linked off the Formula SAE Rules and Important Documents page on the FSAE Website.

 


Дата добавления: 2015-07-10; просмотров: 190 | Нарушение авторских прав


Читайте в этой же книге: T4.8 Driver Egress | T5.4 Shoulder Harness | T8.4 Drive Train Shields and Guards | T11.2 Securing Fasteners | T14.5 Suit | T14.14 Fire Extinguishers | APPENDIX T-2 IMPACT ATTENUATOR DATA REPORT | AF4.5 Shoulder Harness Attachment | IC1.9 Fuel Injection System Requirements | IC2.5 Fuel System Location Requirements |
<== предыдущая страница | следующая страница ==>
IC4.2 Primary Master Switch| S4.6 Definitions

mybiblioteka.su - 2015-2024 год. (0.006 сек.)