Читайте также: |
|
item (a) | Earth work | Unity | Quantity | Rate (in rwf) | Amount (in rwf) |
Clearing the site Excavation Footing foundation | m2 m3 m3 | 2.502 | |||
Total |
item(b) | Construction of substructure | unity | quantity | rate | amount | ||
-Consolidation of concrete -Footings -foundation -equalization concrete | m3 m3 m3 m2 | 15.358 15.5 20.7 40.54 | 70.000 | ||||
Total | |||||||
ITEM(C) | GROUND FLOOR WORKS | UNITY | QUANTITY | RATE | AMOUNTY | ||
block column doors windows | m3 m3 m2 m2 | 53.668 12.9 20.5 | 2962473.6 | ||||
Total | 9094463.6 | ||||||
Item(d) | Finishing for ground floor | unity | quantity | rate | amount | ||
1. 2. 3. 4. 5. | Plaster Paint Sub grade concrete Blinding concrete Floor covering | m2 m2 m3 m3 m3 | 961.5 961.5 54.5 343.5 343.5 | ||||
Total | |||||||
Item(e) | First floor works | unity | quantity | rate | amount | ||
1. 2. 3. 4. 5. 6. 7. | Slab Column Blocks Plastering Paint Beam openings | m3 m3 m3 m2 m2 m3 m2 | 71.7 12.5 63.5 941.5 941.5 15.5 164.68 | ||||
Total | |||||
Item(f) | Second floor | unity | quantity | rate | Amount |
1. 2. 3. 4. 5. 6. 7. 8. 9. | Slab Column Blocks Plastering Paint Beam Ceiling Stairs glazing | m3 m3 m3 m2 m2 m3 m2 m3 m2 | 64.5 14.5 77.5 752.5 752.5 14.5 582.5 15.5 73.5 | ||
Total | |||||
Item(g) | roof | unity | quantity | rate | Amount |
1. 2. 3. 4. | Trusses Covering Nail screw gutter | m3 m2 m m | 12.5 168.5 | ||
Total | |||||
Item(h) | Swimming poor | unity | quantity | rate | amount |
1. 2. 3. 4. | Constructed volume Plastering Painting stairs | m3 m2 m2 m3 | 52.5 126.5 126.5 | ||
Total | |||||
Item(i) | reception building | Unity | quantity | rate | amount |
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. | Foundation Blocks Plaster Paint Sub grade concrete Covering finishing core Ceiling Trusses Covering roof Opening Nail screw | m3 m3 m2 m2 m3 m2 m2 m3 m2 m2 m | 8.5 7.5 31.5 31.5 3.1 11.5 11.5 | 168.5 | |
Total | |||||
Item(j) | facing | unity | quantity | rate | amount |
1. 2. 3. 4. 5. 6. 7. | Foundation Equalization concrete Blocks Plaster Paint Coping opening | m3 m2 m3 m2 m2 m m2 | 7.3 | 430517.5 | |
Total | |||||
Item(k) | Cost of electrical installation | ||||
Total | |||||
Item(l) | Cost of plumbing | ||||
Total | |||||
Item(m) | Cost of garden | ||||
Total |
Total cost without contingency and expenditure | 197,472,820 |
Total cost with contingency and expenditure of Motel is 212900917rwf |
Table 2: Bill of quantity
Дата добавления: 2015-07-19; просмотров: 32 | Нарушение авторских прав