Abstract of Estimator of Cost

Foundation Types | Constructing Concrete Lintel | Types of Beams | Stair Case Materials | Plastering | Types of Plaster Finishes | Introduction | Setting out the building | Foundations | Tools used for Wall Construction |


Читайте также:
  1. Abstract
  2. Abstract
item (a) Earth work Unity Quantity Rate (in rwf) Amount (in rwf)
  Clearing the site Excavation Footing foundation m2 m3 m3 2.502    
Total          

 

item(b) Construction of substructure unity quantity rate amount
    -Consolidation of concrete -Footings -foundation -equalization concrete     m3 m3 m3 m2 15.358   15.5 20.7 40.54   70.000  
Total          
 
ITEM(C) GROUND FLOOR WORKS UNITY QUANTITY RATE AMOUNTY
  block column doors windows m3 m3 m2 m2 53.668 12.9 20.5   2962473.6
Total         9094463.6
Item(d) Finishing for ground floor unity quantity rate amount
1. 2. 3. 4. 5. Plaster Paint Sub grade concrete Blinding concrete Floor covering   m2 m2 m3 m3 m3 961.5 961.5 54.5 343.5 343.5    
Total          
 
Item(e) First floor works unity quantity rate amount
1. 2. 3. 4. 5. 6. 7. Slab Column Blocks Plastering Paint Beam openings m3 m3 m3 m2 m2 m3 m2 71.7 12.5 63.5 941.5 941.5 15.5 164.68      
               

 

Total          
 
Item(f) Second floor unity quantity rate Amount
1. 2. 3. 4. 5. 6. 7. 8. 9.   Slab Column Blocks Plastering Paint Beam Ceiling Stairs glazing m3 m3 m3 m2 m2 m3 m2 m3 m2 64.5 14.5 77.5 752.5 752.5 14.5 582.5 15.5 73.5      
Total          
 
Item(g) roof unity quantity rate Amount
1. 2. 3. 4.   Trusses Covering Nail screw gutter m3 m2 m m 12.5 168.5    
Total          
 
Item(h) Swimming poor unity quantity rate amount
1.   2. 3. 4.     Constructed volume Plastering Painting stairs m3   m2 m2 m3 52.5   126.5 126.5    
Total          
 
Item(i) reception building Unity quantity rate amount
1. 2. 3. 4. 5.   6.   7. 8. 9. 10. 11.   Foundation Blocks Plaster Paint Sub grade concrete Covering finishing core Ceiling Trusses Covering roof Opening Nail screw m3 m3 m2 m2 m3   m2   m2 m3 m2 m2 m 8.5 7.5 31.5 31.5 3.1   11.5   11.5       168.5      
Total          
 
Item(j) facing unity quantity rate amount
1. 2.   3. 4. 5. 6. 7.   Foundation Equalization concrete   Blocks Plaster Paint Coping opening m3 m2     m3 m2 m2 m m2         7.3           430517.5
Total          
 
Item(k) Cost of electrical installation        
Total          
           
Item(l) Cost of plumbing        
Total          
           
Item(m) Cost of garden        
Total          

 

 

Total cost without contingency and expenditure 197,472,820
Total cost with contingency and expenditure of Motel is 212900917rwf

Table 2: Bill of quantity


Дата добавления: 2015-07-19; просмотров: 32 | Нарушение авторских прав


<== предыдущая страница | следующая страница ==>
Pavement| ВОСПИТАНИЕ ДЕТЕЙ МЛАДШЕГО ВОЗРАСТА

mybiblioteka.su - 2015-2024 год. (0.016 сек.)