- Trowels
- Building level
- Float
- Strings
- Plumb
- Mortar pan
- Pegs
- Pinch
Beam
Cross beams size
Thickness 30cmx13,5cmx23,5c
Horizontal beam sizes
Have 30cmx23,5cm long
30cmx13,5cm long
- Reinforced concrete
- Timber for formwork
Steps for Beam Construction
Our beam should be cast in situ
Election of timber formwork
Sealing all the joint with mastic between the timber formwork and block work to stop the cement and water leaking out
Painting inside the formwork with realizing oil
Placement of reinforced in the formwork and check that the bars 50cm from each end of the box and supported by spacers
Pour the concrete into the timber box and making sure that it floors down around and under the rods
Slabs
Slab Materials
Reinforced concrete as material for slabs construction
Motel building slabs should cast in situ
Number of Slab of Motels
The motel building has two slabs such as:
- First floor slab
- Second floor slab
First Floor Slab:
- Thickness is 20cm
- Length is 23.5cm
- Width is 13.5cm
- Second Slab
- Thickness is 20cm
- Length is 20cm
- Width is 13.5c
The slab should have enough strength and durability to resist against imposed load, dead load and wind load
Roofs
Roof Types
The motel building roof types is couple roof