Читайте также:
|
|
FIG. 32
Fasten eyebolts 56 to the hull and rudder. Attach rings 57. Pass chain 58 through the rudder ring and attach both ends to the rings on the hull.
FIG. 33
Construct the hawse-hole guards as indicated.
FIG. 34
Position the pieces one on top of the other, then drill them.
FIG. 35
Position the hawse-holes on both sides of the ship towerds the bow. under the second wales and against the cutwater. Deepen the holes drilled above, drilling also the hull where the cable will pass.
FIG. 36
OVERALL VIEW
FIG. 37-38 (Design 2, fig.4)
Plank the Internal side of the bulwarks and transom with strips 63. Position on the interior the frames 71. Make holes at points A and B (sheave holes). On the inside and at the same points, position the reinforcement frames 65 (drilled and tapered strips). Construct and position the bulwarks stanchions (strips 64). Position a first handrail on the bulwarks and transom (strips 66). A second finishing strip 67 will go on top of this one and you will need to round off its upper corners. Position it however only after fastening the coaming hinges (Fig.40 to 45). Apply a piece of strip 67 on the bulwark heads (Fig.48).
FIG. 39
Construct the pin rack with pieces 72 to 77 and position It as Illustrated.
FIG. 40
Construct the coaming hinges as follows: fold In half two 1 cm. pieces of metal strip 68.
FIG. 41
Make the joints for the female part F and the male part M.
FIG. 42
Re-open the metal strip and insert pin 68
FIG. 43
Squeeze it with a pliers in order that the body rests flat while the joints remain rounded for the passage of the pin. Insert the pin used above in the two parts and then cut it according to the width of the hinges.
FIG. 44
Hollow out the heads of the first handrail (66) and of the first strip of the coamings.
FIG. 45
Now position column 70 on the deck stringer In order to support the coaming.
FIG. 46
Make columns 78 to 81 for the parapet and position them on the stringer. Follow both the horizontal and the vertical Inclination of the bulwarks. Make banisters 82 and 83 being careful to follow the lines of the deck. Position them on the column.
FIG. 47
Make pin-racks 84 and 85 and fasten them towards the bow as Illustrated.
FIG. 48-49-50
Make the steps using strips 86 and 87.
Note) The depth of the steps on the wales must be equal to the depth of the steps on the planking (Fig. 49). All steps must be on the same level.
FIG. 51
Make the channels, two of each kind, remembering that when mounted on the sides of the hull, each channel must correspond perfectly to the one on the other side. It is best to detach the piece of wwlas where the channels will be glued in order to better apply • pressure. (Note- The channels are designed to be fastened directly to the hull planking). Position strips A, B and C after mounting the shrouds. Mount channel shelves 94 on the channels. Fig. 48 and design 2.
FIG. 53
Дата добавления: 2015-11-16; просмотров: 82 | Нарушение авторских прав
<== предыдущая страница | | | следующая страница ==> |
Prepare the joints for hinges 55 on pieces 53 and 54. | | | DECK ACCESSORIES |