Читайте также:
|
|
If I had known then, what I know today, by following this guide, I would have managed to complete the operation within 30 days instead of using almost 80 days. By following my guide, anyone can create the foundation for a spectacular operation with only 1 person in less than a month even if adding 2 "resting" days!:-)
Day 1: Moving and getting your equipment and gear into place.
Day 2: Installing all equipment - fume hood, fan etc.
Day 3: Finishing the metal skeletons/cylinders for the blast devices and completing other practical issues relating to gear and equipment.
Day 4: Creating an evacuation/emergency strategy, packing an evacuation kit (survival gear etc.)
Day 5: Grinding 2,5kg of aspirin: 30 minutes with blender, manufacture of acetylsalicylic acid from aspirin (4 hours) + drying in oven (4 hours per batch x 3)
Day 6: Manufacture of acetylsalicylic acid from aspirin (4 hours) + drying in oven (4 hours per batch x 3)
Day 7: Boiling sulfuric acid using 4 cooking plates outside, from 23.00-07.00, 15-18L->5L of 90%+
Day 8: Boiling sulfuric acid using 4 cooking plates outside, from 23.00-07.00, 15-18L->5L of 90%+
Day 9: Creating Picric Acid (6 out of 12 batches using 3 x hot plate stirrers)
Day 10: Creating Picric Acid (12 out of 12 batches using 3 x hot plate stirrers). Completed
Day 11: Purification of Picric Acid
Day 12: Purification of Picric Acid
Day 13: Purification of Picric Acid. Completed
Day 14: Creating DDNP
Day 15: Creating DDNP. Completed
Day 16: Relocation of 27-0-0 fertilizer. Break down a 600kg bag into 13-14 x 50kg bags, load in the truck, drive to location where you are going to crush them if needed.
Day 17: Relocation of fertilizer. Break down another 600kg bag into 13-14 x 50kg bags.
Day 18: Relocation of fertilizer. Break down the last 600kg bag into 13-14 x 50kg bags.
Day 19: Initiate fertilizer grinding phase using 4 stationary blenders simultaneously. It will take aprox. 30-40 minutes to complete a full 50kg bag of ANFO, including the addition of the diesel and sealing the inner and outer bag with pieces of duct tape. It should be done nighttime between 23.00-07.00 as its quite noisy. The task also includes filling 20L plastic containers with diesel, and then breaking each 20L container down to 4L containers (empty distilled water containers) Complete 9 x 50kg bags of ANFO.
Day 20: Complete 9 x 50kg bags of ANFO.
Day 21: Complete 9 x 50kg bags of ANFO.
Day 22: Complete 9 x 50kg bags of ANFO. Completed.
Day 23: Mix in 2,5% (by weight) micro balloons and 10-15% (by weight) aluminium powder into the now hardened ANFO.
Day 24: Mix in 2,5% micro balloons and 10-15% aluminium powder into the now hardened ANFO.
Day 25: Mix in 2,5% micro balloons and 10-15% aluminium powder into the now hardened ANFO.
Day 26: Prepare trucks for transportation.
Day 27: Prepare trucks for transportation.
Day 28: Prepare trucks for transportation.
Day 29: Completed
The following chart illustrates labour required vs. risk of apprehension for individuals who are NOT already on any watch list.
Risk vs. Labour | Time required to complete | Risk of apprehension |
1 person | 30 days | 30% |
2 people | 20 days | 60% |
3 people | 16 days | 85% |
4 people | 13 days | 90% |
5 people | 12 days | 90-95% |
The old saying; "if you want something done, then do it yourself" is as relevant now as it was then. More than one "chef" does not mean that you will do tasks twice as fast. In many cases; you could do it all yourself, it will just take a little more time. AND, without taking unacceptable risks. The conclusion is undeniable.
I believe this will be my last entry. It is now Fri July 22nd, 12.51.
Sincere regards,
Andrew Berwick
Justiciar Knight Commander
Knights Templar Europe
Knights Templar Norway
Further studies
Дата добавления: 2015-07-17; просмотров: 85 | Нарушение авторских прав
<== предыдущая страница | | | следующая страница ==> |
Events on the farm from May 2nd 2011 to June 23rd 2011 | | | The state of the Indian/Hindu resistance - Indian nationalists |