Студопедия
Случайная страница | ТОМ-1 | ТОМ-2 | ТОМ-3
АвтомобилиАстрономияБиологияГеографияДом и садДругие языкиДругоеИнформатика
ИсторияКультураЛитератураЛогикаМатематикаМедицинаМеталлургияМеханика
ОбразованиеОхрана трудаПедагогикаПолитикаПравоПсихологияРелигияРиторика
СоциологияСпортСтроительствоТехнологияТуризмФизикаФилософияФинансы
ХимияЧерчениеЭкологияЭкономикаЭлектроника

Assignment 11

Читайте также:
  1. ASSIGNMENT #10
  2. ASSIGNMENT #2
  3. ASSIGNMENT #4
  4. Assignment #5
  5. Assignment #5.
  6. Assignment 1. Study the Formula of Persuasive Speech.
  7. ASSIGNMENT 10

Assignment 1

The company has one worker who works 8-hour shift per day. Calculate annual:

Nominal fund of working time

Maximum possible fund of working time given the vacation is 24 calendar days.

Assignment 2

The quarter plan for manufacturing workshop is 620 sets of details. 8.2 hours of turning work and 7.1 hours of milling work are needed to produce one set of details.

Coefficient of fulfillment of norms of output at each type of work is 110 and 115% correspondingly

Planning quarter effective fund of working time of one worker is 458 hours.

Calculate necessary number of workers.

Assignment 3

The company has 2000 units of equipment.

There are two shifts

Norm of service is 20 units of equipment per one mechanic.

Nominal fund of working time is 265 days

Planning effective fund of working time is 230 days

Calculate the necessary number of mechanics

 

NE = (number of equipment x number of shifts x coefficient of transfer of attendance number into number of employees)/norm of service

Assignment 4

XXXXX

Assignment 5

Calculate the number of employees of the company if:

The company works non-stop (3 shifts)

Number of equipment – 60

Every piece of equipment is served by 3 people

Assignment 6

Average number of employees is 400 persons, number of employees at the beginning of the period is 395 persons.

Hired during the period – 31 persons

Fired during the period – 45 persons, including 17 for violation of discipline and 15 – by their own wish

Calculate indices of hiring turnover, firing turnover and fluctuation of personnel

Assignment 7

Yearly output at the enterprise is 200 K tons. Calculate indices of labour productivity accordingly to the following data

Category Number, people Maximum possible yearly fund of one worker, hours
Workers, including main support personnel     1 712 1 768
Managers   1 701
Specialists   1 701

 

Assignment 8

Output per one employee was 5 K UAH last year

Production volume at enterprise was 16 mln. UAH last year.

It will increase in the planned year by 15 %.

300 employees will be fired because of increase in technical level of manufacturing.

60 more persons will be fired because of better management

But 130 new employees are needed because of changes in technology and structure of manufacturing process.

Determine changes in labour productivity in the planned year.

 

Assignment 9

A plant is producing plastic items by method of molding.

Yearly volume of production is 900 K units.,

labour intensiveness is 0.35 hours.

Duration of one shift is 8 hours.

Intrashift losses of time because of workers – 1.5%, regulated idle time – 3%.

Fulfillment of rate of output is 105%.

Number of working days in a year – 223.

Calculate necessary number of workers.

Assignment 10

Number of industrial-production personnel at the enterprise by categories is given in the table

Calculate output per one worker and per one employee if enterprise produced goods for 750 mln UAH

Main workers  
Support personnel  
Managers  
Specialists  

 

Assignment 11

Technological labour intensiveness is 1.5 man-hour / unit.

Planning yearly effective fund of working time per one employee is 1750 hours.

Calculate total labour intensiveness if we have the following figures:


Дата добавления: 2015-10-31; просмотров: 88 | Нарушение авторских прав


<== предыдущая страница | следующая страница ==>
Dota2 Semi Series SLTV| Exercise 2. Insert the correct preposition before the gerund where required.

mybiblioteka.su - 2015-2024 год. (0.006 сек.)