In September 2012 a contract was concluded to perform design and survey work on the project "Reconstruction of the unfinished construction of a pilot factory of special machine tools, equipment and special tools" for a factory for the production of powder coatings"
On the territory of unfinished construction project is supposed to be placed the administrative and service buildings and industrial building.
There will be all the necessary engineering communication lines. The production building is a one-story framed building with a basement, total area is 9720 m2.
Administrative building: a two-story building with a basement skeleton of 2,000 m2.
The main production of powder coatings will be represented by eight production lines with total capacity of the finished product by 4.6 t / h. The total number of workplaces will be more than 120 people.
***