Parameter Value Units

Для магистрантов специальности 220200 | ВВЕДЕНИЕ. | The Aspen Plus Main Window | Using Help | Entering Data on a Sheet | To Use the Next Function to Display the Next Required Sheet | Running the Simulation | Overhead Vapor | Creating a New Simulation | Operation Block |


Читайте также:
  1. Beat-wide Parameters
  2. Bond What's the present value of my bonds?
  3. Classification of phraseological units according to their contextual properties is suggested by
  4. Consider the following statements and say if you agree or disagree with them. Use the introductory phrases given in the previous Units.
  5. Converting values
  6. Converting values Преобразование значения
  7. FIRE-RESISTANCE SECURITY OF PROTECTING UNITS 1 страница

Temperature 220 F

Pressure 20 psi

Toluene flow rate 200 lbmol/hr

MCH flow rate 200 lbmol/hr

Because the default parameters and units are correct for this

simulation, you only need to enter the values.

The Streams | 1 | Input | Specifications sheet is complete:

2 Click.

The Streams | 2 | Input | Specifications sheet appears. Make

Stream 2 the phenol feed stream.

Getting Started Building and Running a Process Simulation Model3-15

3 Enter the following specifications for Stream 2:

Parameter Value Units

Temperature 220 F

Pressure 20 psi

Phenol flow rate 1200 lbmol/hr

4 Click.

The Blocks | B1 | Setup | Configuration sheet appears:

Entering Unit Operation Block Data

On the Blocks | B1 | Setup | Configuration sheet, the number of

stages, the condenser type, and two operating specifications are

required data. The reboiler type, valid phases, and convergence

method have default choices displayed in shaded type.

1 Click each box and read the descriptive prompts.

3-16Building and Running a Process Simulation Model Getting Started

If you click while the sheet is incomplete, the Completion

Status message box appears indicating the missing specifications:

Click to close the Completion Status dialog box.

2 Enter the following specifications for the column:


Дата добавления: 2015-08-20; просмотров: 62 | Нарушение авторских прав