Читайте также: |
|
58. A nationwide parcel delivery service keeps track of the number of late deliveries (more than 30 minutes past the time promised to clients) per day. They plan on using a control chart to plot their results. Which type of control chart(s) would you recommend?
a. - and R-charts
b. p-charts
c. c-charts
d. -, but not R-charts
e. both p- and c-charts
C (Statistical Process Control (SPC), moderate)
59. A run test is used
a. to examine variability in acceptance sampling plans
b. in acceptance sampling to establish control
c. to examine points in a control chart to check for natural variability
d. to examine points in a control chart to check for nonrandom variability
e. none of the above
D (Statistical Process Control (SPC), moderate)
60. Which of the following is true regarding the process capability index Cpk?
a. A Cpk index value of 1 is ideal, meaning all units meet specifications.
b. The larger the Cpk, the more units meet specifications.
c. The Cpk index can only be used when the process centerline is also the specification centerline.
d. Positive values of the Cpk index are good; negative values are bad.
e. None of the above is true.
B (Process capability, moderate)
61. If the Cpk index exceeds 1
a. the AQL must be smaller than the LTPD
b. s must be less than one-third of the difference between the specification and the process mean
c. the x-bar chart must indicate that the process is in control
d. the process is capable of Six Sigma quality
e. the process is characterized as "not capable"
Дата добавления: 2015-11-16; просмотров: 70 | Нарушение авторских прав
<== предыдущая страница | | | следующая страница ==> |
A (Statistical Process Control (SPC), moderate) | | | B (Process capability, moderate) |