Читайте также: |
|
Plot
Getting Started Building and Running a Process Model Analyzing Properties 8-7
9 Select Gamma to plot activity coefficients versus mole fraction
of acetone.
10 Click to continue.
The Plot Wizard Step 3 window appears.
11 In the Component to plot field, click and select
ACETONE.
12 Click Finish to accept defaults for the remaining plot settings
and generate the plot.
8-8 Analyzing Properties Getting Started Building and Running a Process Model
The activity coefficient plot appears.
From this plot you can see the infinite dilution activity coefficients.
13 Close the Plot and Binary Analysis Results windows.
Note: In the Binary Analysis dialog box, you can click Save as
Form to save your interactive property analysis to forms within the
Data Browser. Saving an interactive property analysis as forms
enables you to preserve the input and results of this property
analysis to view or modify at a later time.
14 Close the Binary Analysis dialog box.
At this point you could change the run type in the Setup
Specifications Global sheet to Flowsheet, define a flowsheet, and
proceed with a simulation. However, for this simulation, stop here.
15 From the File menu, select Exit.
16 In the Aspen Plus dialog box, click No.
Getting Started Connecting to the Aspen Plus Simulation Engine 9-1
Дата добавления: 2015-08-20; просмотров: 74 | Нарушение авторских прав
<== предыдущая страница | | | следующая страница ==> |
To Generate a Txy | | | Лабораторная работа № 5. |