Студопедия
Случайная страница | ТОМ-1 | ТОМ-2 | ТОМ-3
АрхитектураБиологияГеографияДругоеИностранные языки
ИнформатикаИсторияКультураЛитератураМатематика
МедицинаМеханикаОбразованиеОхрана трудаПедагогика
ПолитикаПравоПрограммированиеПсихологияРелигия
СоциологияСпортСтроительствоФизикаФилософия
ФинансыХимияЭкологияЭкономикаЭлектроника

Connecting the Measured Variable

Converting to True Components | To Tell Aspen Plus to | Simulation | Directory | Entering Dynamic Data in Aspen Plus | Geometry and Heat Transfer Data | Entering Tray Geometry | Running the Steady-State Simulation | Control Scheme | Starting Aspen Dynamics |


Читайте также:
  1. Complete set of automation of management a switch 110 kV with the functions DBRS, ARI, FLD (fixing of line disconnecting)
  2. CONNECTING OF POWER CABLES
  3. Creating optional variables
  4. Creating optional variables Создание дополнительных переменных
  5. Declaring variables
  6. Declaring variables Объявление переменных

Getting Started Guide Tutorial 2 - Modifying the Control Scheme2-11

4. Move the mouse pointer over stream 3 and release the mouse

button on the port marked OutputSignal.

The Select the Control Variable dialog box for stream 3, the

liquid distillate stream, appears.

5. Click STREAMS("3").Zn("MCH") to select the liquid mole

fraction of MCH in the liquid distillate, then click OK.

In the Process Flowsheet window, the cursor becomes an arrow

connected to a solid black line.

6. On the MCHCOMPDT dead-time block, click the port

marked InputSignal.

Because there is only one input variable to connect to, the

control signal (blue broken lines) is automatically connected

to the dead-time block.

7. In the Contents pane of the Simulation Explorer, click and

hold down the mouse button on the Control Signal icon again

and drag it to the Process Flowsheet window.

8. Release the mouse button on the port marked OutputSignal of

the MCHCOMPDT dead-time block.

A control signal is automatically created and is ready to be

connected to a port.

2-12Tutorial 2 - Modifying the Control Scheme Getting Started Guide

9. On the MCHCOMP block, click the port marked InputSignal

to connect the control signal.

The Select the Control Variable dialog box appears:

10. In the Select the Control Variable dialog box that appears,

click MCHCOMP.PV then click OK to connect the control

signal.

Your Process Flowsheet now looks like this:

Getting Started Guide Tutorial 2 - Modifying the Control Scheme2-13

To specify the manipulated variable:

1. Ensure Stream Types is still selected in the Simulation

Explorer.

2. In the Contents pane of the Simulation Explorer, click and

hold down the mouse button on the ControlSignal icon.

3. Drag it onto the Process Flowsheet to the port marked

OutputSignal on the MCHCOMP block.

A control signal (black line with a cursor) is automatically

created and is ready to be connected to a port.

4. Move the pointer to stream 2 and click the InputSignal port.

The Select the Control Variable dialog box appears:

5. To select the phenol component mole flow of stream 2, click

the variable.STREAMS("2").FcR ("PHENOL").

6. Click OK to connect the controller output signal to the

manipulated variable.


Дата добавления: 2015-08-20; просмотров: 37 | Нарушение авторских прав


<== предыдущая страница | следующая страница ==>
Adding a New Controller| Variable is

mybiblioteka.su - 2015-2024 год. (0.005 сек.)